Project Description
PROJECT: SEA-1214 HEROINAS DE SALVORA
Basic and detail engineering development
- Class approval documentation
- Naval architecture
- Hydrodynamics simulations and model testing
- Structural design
- Mechanical systems design
- FMEA documentation
- 3D model and drawings
- Workshop and fabrication drawings
- Shipyard technical support

- LOA: 82.30 m
- LPP: 76.70 m
- B: 18.00 m
- Tmax: 6.30 m
- Oil recovery: 1800 m3
- Bollard pull: 213t
- Speed: 17.6kn
- Crew: 40POB
- Drone deck and hangar
- DP 2
Class notation:
I Hull
Mach, Oil recovery ,Tug ,Fire-fighting 2 -water spraying, standardized design bollard pull, SECOND-LINE,SP
Unrestricted navigation
COMF-NOISE 3 , COMF-VIB 3 , AUT-UMS , MON-SHAFT , CLEANSHIP , INWATERSURVEY , DYNAPOS AM/AT R
PROJECT: Rescue vessel & Ocean going tug
Concept design and preliminary engineering development
- Dimensioning and hull shape
- General Arrangement
- Naval Architecture calculations
- Structural Design
- Propulsion Design
- Main System Design
- Ship Hydrodynamics and Seakeeping analysis
- Electricity
- Safety
- Life cycle assessment
- Minimum safe manninng study

- LOA: 82.35 m
- LBP: 76.70 m
- Beam: 18.00 m
- Design Draft: 6.00 m
- Depth to Main Deck: 8.00 m
- BP: 200t

Special features:
- Drones flight deck
- ECO Diesel-electric propulsion system
- Oil Recovery
- DP-2
- Fifi 2
PROJECT: Rescue & Anti-Polution Vessel
Concept design and preliminary engineering development
- Dimensioning and hull shape
- General Arrangement
- Naval Architecture calculations
- Propulsion Definition
- Main System Design
- DP capability plots

- LOA: 76.20 m
- LPP: 72.00 m
- B: 16.40 m
- T: 5.10 m
- Oil recovery: 1000 m3
- Speed: 15kn
- Crew: 15POB
Class notation: BV + HULL MACH, SUPPLY VESSEL, SPECIAL PURPOSE SHIP, FIRE FIGHTING SHIP FI-FI I with WATER SPRAY. UNRESTRICTED NAVIGATION, SDS , AUT-UMS Port, CLEANSHIP SUPER, DYNAPOS AM/AT R, ALM, ALS
PROJECT: Submarine Rescue Vessel
Concept design and preliminary engineering development
- Dimensioning and hull shape
- General Arrangement
- Naval Architecture calculations
- Structural Design
- Propulsion Design
- Main System Design
- Ship Hydrodynamics and Seakeeping analysis
- Electricity
- Safety
- Life cycle assessment
- Minimum safe manninng study
